PFC was granted contract by EGA for to provide safe access to Roofs which includes Permanent Staircases & Roof Walkways. The main purpose of this project was to Design, Supply and Erect steel structure for Permanent Roof Access Platforms.
PFC supplied special Walk way system from FRP materials to accommodate the roof conditions which required to handle the high temperature generated from machinery inside the Plants under the roof.
Project contained 10 Staircases with around 100 ton of steel, 1,000 Linear Meters of Roof Walk ways and dozen of Cat Ladders. All erection works had to be carried in summer season under high temperatures, so extreme safety precautions was incorporated.