The main aim of the project was to excavate the HDPE pipe laying of depth 1.5 m. Demolition of existing valve pit. Construction of new valve pit.. This is an accommodation provided by the client to their operational workers inside the plant in a designated area with all required facilities as DM standards of 3m2/per person known as residential area
PFC has done Barricading and hand excavation for 6” HDPE pipe line laying to 1000 Lm length and depth of 1.5. Removal of precast slabs – 2T weight using boom loader for old valve pits – 17nos. Existing old valve pit, demolition using Hilti 2000, 800 breaker in order to construct new valve pit. De shuttering for valve pit base slab -22nos,chipping and fosroc super cast SW 30 swellable water bar installation to it.