Client

Emirates Global Aluminum

Scope

Power Generation Plant Structural Strengthening Work

Location

Jebel Ali,Dubai, UAE

Contractor

Perfection Frontier Contracting LLC

POWER CONTROL BULIDING STRUCTURAL STRENTHENING

Building 420 is a 40 year old building controlling the full electrical system of the 420KV Power control building Jebel Ali Site. It is also having many mcc panels which were getting overheat during summer season.

Due to that there was a special package to increase the AC chillers Capacity to get  low temperature  for all the electrical equipment inside the building.

PFC was awarded the civil package to make the opening in the roof and walls with strengthening scope for the roof and near the opening

PFC provided design advice and install their strengthening solutions to worked closely with the general contractor and engineer of record. This partnership allowed the project to stay under budget and finish ahead of schedule.