Mon – Sat: 8:30am – 5:30pm • Arenco Building 4, DIP-1, Dubai

Client

Emirates Global Aluminum

Scope

Steel Fabrication & Erection including Roof & Wall Cladding

Location

Abu Dhabi UAE

Contractor

Perfection Frontier Contracting LLC

EMAL CAST HOUSE ROOF EXTENSION

PFC was granted contract by Al Taweelah for their Cast House Roof Extension. The main purpose of this project was to Design, Supply and Erect steel structure for the extension of roof including cladding works.

Al Taweelah is situated in Abu Dhabi’s Khalifa Industrial Zone (KIZAD), about halfway between Abu Dhabi and Dubai. Nine casting stations are located in Al Taweelah’s cast house.

In order to comply with Al Taweelah safety and quality standards frequent site inspections was done. During these Inspections, installation strategies as per site conditions was discussed based on the base strata.

PFC conducted various safety training sessions such working at height for the workers to ensure the safety and quality of work is not compromised at any stage.

Global Leadership of PFC Group

OUR CLIENTILE