Mon – Sat: 8:30am – 5:30pm • Arenco Building 4, DIP-1, Dubai

Client

Dross Bunker Storage Facility

Scope

Breaking of existing damaged concrete floor & cast MF44 – Refractory grout

Location

Dubai, UAE

Contractor

Perfection Frontier Contracting LLC

DROSS BUNKER SPECIAL FLOORING REPAIR WORKS

Dross Bunker area Intended to demolish the existing damaged slab, prepare surface, supply install, cast the concrete with steel tables in Dross Bunker area in order to facilitate the safe operations for dross dumping.

PFC was awarded the contract  for demolishing the existing damaged slab and prepare surface and to fix it. PFC has completed the project within time and the clients were well satisfied.

This was a difficult job, with the building phase occurring concurrently with the oven’s refractory relief and in a live castle with little interruption to the customer’s adjacent furnaces’ output. To ensure that the customer meets its year-end objectives, stringent deadlines must be met.